Full Aggregate

A full aggregate exposure finish is achieved by grinding between 2-3mm off of the surface to reveal the larger aggregates within the mix. To achieve this we require the slab to be placed as flat as possible with attention being paid to not push the aggregate down with either the screed bar or boots and to try and keep the aggregate as close to the surface as possible. As with the Salt and pepper finish we cannot grind down localised areas to try and expose more aggregate as this adversely affects the polishing process.